Dec 97

In December the hanging tiles on the outside were finally complete, we had been waiting most of the autumn months for the tiler to finish off. Now from the road at least it looks complete.


At the rear back porch still needed to be finished.

Inside there is still a lot of work to do some of the floors are down and the ceiling insulation is installed. We still need to form the screeded bathroom floors which will have underfloor heating.

latest